Water Purifier Mould

Water Purifier Mould

Location:Zhejiang, China
Business Type:Manufacturer, Exporter
Brands:SOLIDCO
Certificate:SGS,CE,CO,COC
Payment method:T/T,L/C,Western Union
Minimum order quantity:One Set
Price:Consutation with customer's requirement
Packing details:wooden crate
Delivery time:30-60days
E-mail: [email protected]

about

 

SOLIDCO MOULD CO.,LTD is a comprehensive manufacturer of plastic injection moulds with two decades of experience, located in China Mould Town-Taizhou, with an annual export value of over $2.5 million (USD) and moulds have been sent to Brazil, Argentina, Uruguay, Bolivia in South America, Hungary, Russia, Turkey in Europe, Iran in Mid-East, also African and Asian countries, etc.

SOLIDCO MOULD focuses on quality and on-time delivery. We dedicate ourselves to produce injection moulds, injection moulding parts that exceed our customers’ requirements with a complete set of CNC equipments.

Many people already know us as one of the best manufacturers and exporters of plastic chair moulds, table moulds, crate moulds, pallet moulds, and precision moulds and so on.

Our current business line includes:

Accept small orders of Injection moulding products with small MOQ.

We have been improving the production technology during mould manufacturing. SOLIDCO MOULD has been improving the staff's knowledge since it's establishment. Customer’s satisfaction is our final target.

We adopt the following QC procedure to ensure quality of world-wide standard.

1)Do the mold-flow after the part design.

2)Design moulds and check the parameter of injection machine as reference.

3)Engineering group inspect  the mould structure and confirm.
4) Inspection for mould material hardness
5)Professinal people follow mould machining with each step per the mould schedule.
6) Report for mould trial and sample
7) Final inspection before delivery
8) Package inspection before delivery

 

Flow chart

flow_chart

SOLIDCO Mould is good at using mold flow to find the problems at the beginning, and pay attention to them is designing and producing process, work out the solutions to reduce risk, lower costs, shorten the construction period and improve quality.

moldflow1 moldflow2

Original design:
Hot runner with 6 valve gates, from the fill process, we can see hesitation on the top center. And there are weld lines on the main surface.

Solution:
No.1 opened first, when the melt front reached the No.2&3 gates, No.2&3 opened, then the No.4&5 opened, in this mode ,the top side may filled before the under side.

moldflow3 moldflow4

Although the runner is unbalanced, but we can control the time of the valve gates to decrease the influence of the unbalanced flow. And the 4 gates on the top side can give a good compensation for shrinkage.

Most of the weld lines happened on the grid, there are no weld lines on the main appearance.

 

Leave a Message